India resumes work on long-stalled 1,856 MW Sawalkot hydropower project in Jammu & Kashmir, signalling a bold shift in Indus water policy post-Pahalgam attack.
India resumes work on long-stalled 1,856 MW Sawalkot hydropower project in Jammu & Kashmir, signalling a bold shift in Indus water policy post-Pahalgam attack.
India Announced Big Move As Pakistan Kept Watching: Sawalkot Hydropower Project On Chenab To Resume After 40 Years
July 31, 2025
0